Renovation budget calculator: how much of your contingency is left?

Set your total budget and contingency, then list each job with its first estimate, the quote you accepted and the final cost when you know it. See the expected total, how much of the contingency is already used, and what's left.

✓ TestedSame calculation as the tested spreadsheet
Contingency left–
Contingency set aside
Budget for the work
First estimates, total
Expected cost (final, else quote, else estimate)
Versus the estimates
Contingency used
Left in the whole budget

How it works

The contingency is held back from the total: a $46,000 budget with 10% leaves $41,400 for the planned work and $4,600 in reserve. Each job counts at the best number you have: the final cost if you know it, otherwise the quote you accepted, otherwise the first estimate. When the expected total passes the work budget, the difference comes out of the contingency. The versus-estimates line shows how far the quotes and final costs have moved from your first estimates, which is usually the earliest warning. The worked example is in how much contingency a renovation needs.